Beverly Hills ADU Construction Sized to the Panel
Beverly Hills ADU construction placed around the house's electrical capacity, with wide glass opening onto a private shaded patio, by Palmcrest Contractors.
How much spare capacity the house panel holds is the first utility question for a Beverly Hills backyard unit. With room to spare, a short feeder lets the unit sit near the panel's side of the house. Without it, a service upgrade or a separate meter frees up other spots in the yard. That answer guides where the glass door and its shaded patio can face.
Panel, feeder and meter
Adding the unit's heat pump, water heater, cooktop and lights to what the house already draws gives the load total the electrical design starts from. A feeder from the main panel to a small subpanel in the unit is the simplest path, run in conduit under the yard in one trench with the water line. Where the house service is too small, upgrading it can be simpler than a second service, though a separate meter gives the unit its own bill. Either choice is coordinated with the utility, and the trench is routed so it never cuts through the future patio.
Review at the City of Beverly Hills
The permit for a Beverly Hills unit is issued by the city, whose building reviewers check the electrical plan, the yard setbacks, building separation and energy compliance. Some addresses carry extra design or planning review, which we confirm before drawing. During the build, the feeder trench is inspected open before it is backfilled, and the subpanel and service work are inspected before the walls close. Only then do the glass doors, finishes and patio go in, so the outdoor room is the last thing finished.
ADU Construction in Beverly Hills: what people ask
As near to the panel's side of the house as light and privacy permit, with the unit's glass turned toward ground the main house does not overlook. Small high windows on the wall toward the house keep both sides private. If the nicest garden spot is far from the panel, a longer feeder or a new meter can still reach it.
A single-story Beverly Hills ADU of up to 500 square feet fits the package. Here we take particular care with the floor plan, since it places the subpanel, the kitchen circuits and the door openings that the electrical review follows. Anything larger or two stories high is quoted after we visit.
Yes. The patio door can be a wide slider or a set of folding panels, opening onto stone or concrete with an outlet and a light on the unit's own circuit. A pergola, a solid cover with a fan or a shade sail keeps the space comfortable, and planting screens it from the main house.
ADU Construction in other cities
More of what we build in Beverly Hills
Start your project in Beverly Hills
Send the form with the size of the space and what you want to change.

