El Segundo Room Additions Built in Order

El Segundo home additions run in a set order so the glass arrives last, into a frame that is squared and dry, by Palmcrest Contractors.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

Glass goes in near the end of an El Segundo addition, and everything before it exists to protect that moment. The frame is squared, the opening measured, the flashing lapped, the roof dried in. Only then do the doors and windows arrive, to be set in a frame that is ready for them and has already been inspected.

The order before framing

Drawings and engineering come first, then the permit. After that the yard is cleared and protected, utilities in the path are marked and moved, and footings are dug and inspected. Concrete needs time to cure before walls load it, so framing waits on that. The floor system goes down next, then the walls, with the opening for the glass left sized for the header the engineer specified. Dust control and a protected path through the house go up before any wall is touched, so the rest of the home stays usable.

Dry roof, then glass

With the roof on and the wrap and flashing lapped, the room is dry and the glass can be set. Rough plumbing, wiring and ducts are inspected before insulation, and the insulation is inspected before drywall. The patio and any cover follow the interior, so heavy trades do not tramp across fresh paving. On a coastal site, exterior hardware is stainless or coated to resist salt. Final grading and cleanup close the job, and the last inspection signs off the permit.

About room additionsEverything we build in El Segundo

Room Additions in El Segundo: what people ask

More of what we build in El Segundo

Start your project in El Segundo

Send the form with the size of the space and what you want to change.