Decks & Patios in El Segundo
Decks, patio covers and pergolas in El Segundo, built in an order that keeps footings, flashing and framing open for inspection before anything covers them.
Tearing out the old slab or the tired deck and hauling it away opens an El Segundo job, and that only starts once the city has approved the drawings. Footing holes come next and get inspected while open. Then flashing goes onto the house wall, the ledger and joists follow, and an inspector sees the bare frame. Boards, rails, lights and any cover go on after that. Near the ocean, each connector in the chain is stainless or hot-dip galvanized.
Why the sequence matters
Each step hides the one before it. Once concrete fills a footing hole, nobody can check its depth, so the inspector looks first. Once decking covers the joists, the hangers and the ledger bolts disappear, so the frame inspection happens with the surface off. Wiring for lights or a fan runs through the framing before the roof panels of a cover close it in. Holding to that order keeps every part open to the eye that needs to see it, and spares anyone from pulling up finished boards to fix something underneath.
Two separate answers: height and footings
The door the deck serves gives the target surface height, a short step below the interior floor. From there we work out joist depth and where the beam line sits beneath. Footing size and depth come from a different set of inputs: the bearing capacity of the soil, the load the deck and any cover will carry, and the minimum depth the code requires. Tall posts also need bracing. Both answers go on the plan, so the reviewer can follow how the surface height and the foundation were each decided.
Decks & Patios in El Segundo: what people ask
Close to level, yes. We set the surface a small step below the sill so rain that blows across it stays outside. A flush transition can work under a covered entry or with a grated drain at the door. It also depends on whether the house floor sits far enough above the yard to fit framing below.
A solid aluminum or wood-framed roof gives full shade and keeps furniture dry on a damp morning near the ocean. Louvers let you tune it, open for light and shut for shade. On a deck that catches late sun, a drop shade or side screen along the low-sun edge can add usable shade where a bigger roof would not reach.
Yes, for most covers bolted against the house wall and for any deck whose height calls for a guard rail. El Segundo's building and safety staff do the review, and a coastal permit may also apply depending on where the parcel sits. We find out which reviews the lot needs, produce the structural set, submit it and walk each inspection with the inspector.
Decks & Patios in other cities
More of what we build in El Segundo
Start your project in El Segundo
Send the form with the size of the space and what you want to change.

