Structural Work in Valley Village
Bearing wall checks before the quote, then engineered beams and footings for Valley Village homes opening a room, by Palmcrest Contractors.
Unscrewing a switch plate on the wall marked for removal gives us the first look inside it at a Valley Village house. A flashlight through the gap beside the electrical box shows the stud size, any blocking, and whether a pipe or duct runs in the cavity. Up in the attic we then follow the ceiling joists to see what rests on top of that wall. Both readings go into the quote before an engineer sizes anything.
What the first look decides
The cavity and the attic together tell us whether the wall carries load and how much work hides inside it. A drain stack or gas line in the way has to be rerouted, which adds a plumber to the scope. Ceiling joists that lap over the wall from both sides call for a beam, and a second story above calls for a heavier one, with posts taking that weight to the foundation. We note the floor under each future post, since a raised floor may need a new pier and a slab may need cutting for a footing.
Beam, posts and the permit
Once the engineer has sized the beam, we build temporary walls on each side to hold the ceiling, take out the old studs and set the new beam on posts that bear on footings sized for the load. Hold-downs or straps go wherever the engineer calls for them. Valley Village belongs to the City of Los Angeles, so LADBS reviews the plans, and its inspector sees the footings and the framing before any drywall closes them up. Then the ceiling and floor get patched so the opening reads as if it had always been there.
Structural Work in Valley Village: what people ask
Possibly. The attic answers most of it: if joists or rafters bear on the wall, or a post above lands on it, the wall carries load. One that runs parallel to the joists often holds up nothing beyond its own drywall, though a beam or a point load can still sit on it. An engineer settles the question for the permit.
Yes, when the numbers allow. Engineered lumber or a steel beam can sit level with the joists, which then hang from it in hangers so the ceiling stays one flat plane. A long span or a heavy load from a floor above can make the beam deeper than the joists, and then part of it shows below the ceiling.
A civil or structural engineer holding a California license does the calculations and drawings for the beam, posts and footings. We supply the site measurements, and the stamped sheets go to LADBS for plan check. The engineer also answers reviewer comments and, if we find something unexpected inside the wall, revises the design before work continues.
Structural Work in other cities
More of what we build in Valley Village
Start your project in Valley Village
Send the form with the size of the space and what you want to change.