Structural Work in North Hollywood

Shoring first, then the wall, then the beam. Palmcrest Contractors runs North Hollywood structural work in a set order so the roof stays supported.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

Temporary posts go in ahead of any demolition at a North Hollywood opening, because the roof needs somewhere to rest once the wall stops holding it. After that the sequence runs wall out, beam up, posts down to their footings, and only then the finishes. Skipping ahead is what makes ceilings sag and glass doors bind.

Shoring, then demolition

Before anything is cut, temporary posts or adjustable steel shores go in on both sides of the wall to hold the ceiling and roof. Utilities inside the wall get located and rerouted next, and the drywall comes off so the studs can be removed in sections. Dust barriers go up between the work and the rooms still in use. Only after the load rests safely on the shores do the studs between the posts come out, a few at a time, which keeps the structure steady while the opening grows.

Beam, posts, footings and finishes

The beam is lifted into its pocket and seated on its posts, which stand on new footings that were dug, inspected and poured earlier. Shims and bolts tighten the connections. The shores stay until the engineer's details say they can go. Then patching starts, with drywall, texture and paint first and flooring last, so a new threshold lines up with the finished surfaces. Doing the finishing last protects the yard-facing doors from dust and keeps the patio entry looking fresh.

About structural workEverything we build in North Hollywood