Room Additions in Sun Valley

Sun Valley room additions finished in a set order, from shell to paint to floors, with the garden doors masked until the end.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

Floors go in last on a Sun Valley addition, after paint, trim and cabinets, so nothing drips onto them. Before that the shell is closed and inspected, the glass is set and masked, and the interior dries. The sequence reads as dull and delivers a room that opens to the yard with floors that look untouched.

From shell to finish

After the insulation inspection, drywall goes up, then texture and primer. Cabinets and trim follow, then the paint. Flooring comes after the paint is dry, with the baseboard on top. Door hardware, outlet covers and fixtures are the final pieces, installed by trades with no more cutting or grinding to do. A walkthrough closes the list with whatever small items remain. Between each step the room is vacuumed and the surfaces checked, because dust left under flooring shows later as a lump. The insulation sign-off comes before any board is hung.

Glass and the opening to the yard

The sliding or folding door is set once the walls are framed and wrapped, then covered in protective film and its track taped so plaster dust stays out. Its threshold height is matched to the finished floor, which is why the flooring thickness is fixed before the door is set. Flooring thickness is on the plan to keep the sill height right. LADBS issues the permit and signs off the finals for Sun Valley, with the energy forms and glass labels on hand for the inspector.

About room additionsEverything we build in Sun Valley

Room Additions in Sun Valley: what people ask

More of what we build in Sun Valley

Start your project in Sun Valley

Send the form with the size of the space and what you want to change.