South Pasadena Room Additions, Quoted Line by Line

South Pasadena room additions with a written quote that separates the new room, the glass wall and the tie-in, from Palmcrest Contractors.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

Open the written quote for a South Pasadena addition and it reads in blocks: the structure of the new room, the glass wall and deck, the mechanical and electrical work, and the join to the existing house. Each block can be moved on its own. A wider opening shifts the structure line, a finish choice shifts another, and nothing else is quietly changed.

Why separate lines help

A single number hides what drives it. Splitting the quote shows how a folding door system, a fixed window and a beam each add to the total, and how a tied-in roof takes more labor than a new one. Alternates can be added as extra lines, such as a deck or a larger overhang, so the room can be decided in pieces. A line can be dropped or deferred without rewriting the others, so the room stays within what is wanted.

What moves a line

The span of the glass wall moves the beam. The floor area moves the foundation and the energy report. The condition of the existing wall moves the tie-in. Roof complexity moves the framing. Before construction begins, the city building department receives the set, and any comments from that review that change the scope are written up as an adjustment, so the quote stays readable from start to finish. Sizing the beam comes first, since glass width and roof load feed the structure line directly.

About room additionsEverything we build in South Pasadena

Room Additions in South Pasadena: what people ask

More of what we build in South Pasadena

Start your project in South Pasadena

Send the form with the size of the space and what you want to change.