Room Additions in Sierra Madre

Sierra Madre room additions that start from the measured step between floor and yard, plus ember-rule details where the lot calls for them.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

A straightedge laid across the back door threshold, a level on top and a tape dropped to the ground outside come out first on a Sierra Madre visit. These readings give the height of the floor over the yard. That drop sets the step height, the patio level and how deep the footing must go under the new glass wall.

What the drop decides

A floor held high over the yard needs steps or a landing outside, and the landing becomes the first piece of the patio. A floor close to grade can step out level, which suits wide doors, though the patio then has to fall away from the sill. Either way the drop is recorded door by door and written on the drawing, so the new floor lines up with the old one inside and the doors open at the right height outside.

Fire map and city review

Sierra Madre has ground on the fire hazard map, so a lot there can face ember-resistance rules for vents, eaves and glazing, and those get settled before the framing is drawn. The city building department reviews the set. If the lot slopes, the readings are repeated along the wall, since the drop can change from one end to the other and the patio must follow it. Setback lines are measured at the same visit, so the drawing starts from real dimensions. Door swing and stair width are tested against the drop on paper before anything is cut.

About room additionsEverything we build in Sierra Madre

Room Additions in Sierra Madre: what people ask

More of what we build in Sierra Madre

Start your project in Sierra Madre

Send the form with the size of the space and what you want to change.