Decks & Patios in West Covina

Decks, patio covers and pergolas built in a fixed order in West Covina, from footings and flashing through to the last rail, by Palmcrest Contractors.

Tell us about the opening, deck or room

We read every request and reply to set up a measure. Photos of the wall or yard help, and we ask for them by email. How we use your details.

To send, add your first name and a phone number or an email.

Footing holes come first on a West Covina deck, and no lumber gets cut until any required footing inspection has passed. The ledger flashing follows, then the frame, then the boards, with the rail going on last. That order keeps the finished deck level with the door and leaves every fastener within reach while the frame is still open to the sky.

From footing to rail

Utility locates and string lines come before the first dig. Footings are sized for the span and the soil, and posts and beams sit on them before a joist is hung. Joists get blocking at the ends and over the beams, and flashing is lapped under the siding before the ledger is bolted through. Boards go down once the frame is square and the fall away from the house has been checked with a level. Stairs are built after the surface so their height matches the finished boards, and the guard is set last, when its posts can be tied into the framing.

Where the cover joins the schedule

A patio cover shares the same calendar as the deck. Post bases are laid out alongside the footings so the cover and the deck frame never compete for the same patch of ground. Rafters, the electrical rough-in for lights or a fan, and any ceiling finish go in before the roof panels close the top. Laying deck boards after the cover frame is up keeps them clear of dropped screws and sawdust. A cover added later can still tie in, but the framing then has to be opened wherever the new posts land.

About decks & patiosEverything we build in West Covina

Decks & Patios in West Covina: what people ask

More of what we build in West Covina

Start your project in West Covina

Send the form with the size of the space and what you want to change.